Production Capacity
GMP production facilities
- Two GMP workshops, one for commercial products and the other for pilot GMP workshops
Device Name |
Total volume |
Material |
Total quantity |
Equipment parameters |
Reaction kettle |
118.22m ³ |
Stainless steel and enamel glass |
79 |
-15~150 ℃, normal pressure |
Hydrogenation kettle |
6.35m ³ |
Stainless steel |
6 |
-15-250 ℃, ~ 10MPa |
GMP production capacity: 20-50 tons/year
Non GMP production facilities
- 5 non GMP workshops, including 3 intermediate workshops, 1 hydrogenation workshop, and 1 solvent workshop
Device Name |
Total volume |
Material |
Total quantity |
Device parameters |
Reaction kettle |
408m ³ |
Stainless steel and enamel glass |
147 |
-19~150 ℃, -0.1~0.25MPa |
Hastelloy alloy kettle |
1m ³ |
Hastelloy |
1 |
-19~150 ℃, -0.1~0.25MPa |
Low temperature kettle |
2m ³ |
Stainless steel |
1 |
-78~150 ℃ |
Hydrogenation kettle |
30m ³ |
Stainless steel and Hastelloy |
13 |
-15-250 ℃,~8MPa |
Distillation unit |
|
Stainless steel |
3 |
|
Molecular sieve membrane distillation |
|
Stainless steel |
2 |
|
High gravity distillation equipment |
|
Stainless steel |
2 |
Non GMP: 300-600 tons/year
Factory Storage Capacity
Storage facilities
- 7 Class A warehouses and 3 Class C warehouses, 1 gas warehouse, 1 hazardous waste warehouse, tank area
- Temperature and humidity control, cool storage (temperature control ≤ 20 ℃) and cold storage (2-8 ℃)