HSE Management System
- Strictly comply with China's safety standardization requirements and pass all government audits and inspections;
- Before each process amplification, a process safety assessment must be conducted, and if necessary, a HAZOP analysis can be performed;
- Temperature and pressure are monitored by DCS and interlocked alarms are set. All hazardous processes are equipped with full process automation control in accordance with government requirements;
- Install gas alarms and fire alarm systems according to standards;
- Provide appropriate and sufficient PPE according to the process;
- The wastewater and exhaust gas treatment device is operating normally as required;
- Strictly follow government requirements to dispose of solid waste;
- Daily training and safety drills.
Three Waste Treatment Capacity
Dalian Factory's Three Waste Treatment Facilities
- After pre-treatment and biochemical treatment, the designed wastewater treatment capacity is 900 tons/day.
- The exhaust gas is treated by RTO to meet national emission standards.
- Waste solid is entrusted to hazardous waste solid treatment companies approved by the government for incineration.